翻訳と辞書
Words near each other
・ Line 4 (Madrid Metro)
・ Line 4 (Rio de Janeiro)
・ Line 4 (Saint Petersburg Metro)
・ Line 4 (São Paulo Metro)
・ Line 1 (Mumbai Metro)
・ Line 1 (Mumbai Monorail)
・ Line 1 (Naples Metro)
・ Line 1 (Navi Mumbai Metro)
・ Line 1 (Nizhny Novgorod Metro)
・ Line 1 (Rio de Janeiro)
・ Line 1 (Saint Petersburg Metro)
・ Line 1 (São Paulo Metro)
・ Line 1 Yonge–University
・ Line 1, Beijing Subway
・ Line 1, Chengdu Metro
Line 1, Chongqing Rail Transit
・ Line 1, Dalian Metro
・ Line 1, Dongguan Rail Transit
・ Line 1, Guangzhou Metro
・ Line 1, Hangzhou Metro
・ Line 1, Harbin Metro
・ Line 1, Kolkata Metro
・ Line 1, Kunming Rail Transit
・ Line 1, Nanchang Metro
・ Line 1, Nanjing Metro
・ Line 1, Ningbo Rail Transit
・ Line 1, Shanghai Metro
・ Line 1, Shenyang Metro
・ Line 1, Shenzhen Metro
・ Line 1, Suzhou Rail Transit


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Line 1, Chongqing Rail Transit : ウィキペディア英語版
Line 1, Chongqing Rail Transit

| image = 重庆市轨道交通一号线较场口站.jpg
| image_width = 265px
| image_alt =
| caption =
| type = Rapid transit
| system = Chongqing Rail Transit
| status =
| locale =
| start = Chaotianmen
| end = Daxuecheng
| stations = 23
| routes =
| ridership = 574,000 (2014 Peak)
| open = 28 July 2011
| close =
| owner =
| operator = Chongqing Rail Transit Corp., Ltd
| character =
| depot =
| stock =
| linelength =
| tracklength =
| notrack =
| gauge =
| el =
| speed =
| elevation =
| website =
| map = 250px
| map_state = collapsed
}}
Line 1 of Chongqing Rail Transit runs westwards from Chaotianmen to Daxuecheng. Line 1 begin operation on 28 July 2011.〔(Chongqing Metro Line 1 into trial operation )〕
Line 1 runs from Chaotianmen in downtown Chongqing west to Shapingba, and eventually all the way to Shuangbei for a total length of . It is the city's first all-heavy rail subway line and the second completed in Western China. Passenger capacity of the line is 36,000 passengers/hour/direction.
In 1992, the Chongqing government had signed a Build-Operate-Transfer in 1992 with a Hong Kong company, and provided the land for the project, but work ceased in 1997 due to legal issues. Work resumed on the first stretch of the line (from Chaotianmen to Shapingba) on 9 June 2007, and opened to limited operation on July 28.〔http://www.echinacities.com/chongqing/city-in-pulse/chongqing-s-metro-line-1-now-open.html 〕 An extension from Shapingba to Daxuecheng (University Town) began in 2009 and opened on December 21, 2012.
Line 1 has 14 stations, including from east to west: Chaotianmen, Xiaoshizi, Jiaochangkou, Qixinggang, Lianglukou, Eling, Daping, Shiyoulu, Xietaizi, Shiqiaopu, Gaomiaocun, Majiayan, Xiaolongkan, and Shapingba stations. Lieshimu, Ciqikou, Shuangpingnan, Shuangpingbei, Laijiaqiao, Tuzhu, Huxi, Daxuecheng (University Town), and Jiandingpo stations are scheduled to open in 2013 once the Phase 2 extension of Line 1 is complete.
Line 1 has transfer interchange stations with Line 2 at Jiaochangkou in Jeifangbei CBD and at Daping. Line 1 will have transfer station when Line 3 opens later in 2011 at Lianglukou, near the Chongqing Railway Station in the Caiyuanba section of central Yuzhong.
==Service routes==

* XiaoshiziDaxuecheng
* XiaoshiziShuangbei

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Line 1, Chongqing Rail Transit」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.